Industrial BESS

MesPal ESS-125kW-261kWh-C3 (EU)

Industrial BESS 125 kVA / 261 kWh, EU

A compact C3-series LFP storage system in the EU variant. Modular architecture, manufacturer-developed EMS and three-level fire protection.

Rated apparent power125 kVA
Rated energy capacity261 kWh
AC output voltage230 / 400 V
Ingress protection≥IP54

MesPal

Application advantages

Factory-stated use cases and system strengths from the product brochure.

EMS management

Manufacturer-developed EMS for monitoring and remote maintenance.

Modular architecture

System configuration is selected to suit site loads.

Compact cabinet

Approx. 1.4 m² footprint, excluding service clearance.

Three-level protection

Pack and cabinet aerosol protection complemented by water-based protection.

8000-cycle life

Manufacturer conditions: 25 °C, 0.5P, 90% DoD, 70% EOL.

Protected enclosure

At least IP54 protection; siting conditions are defined by the project.

MesPal

Technical specifications

Key factory specifications from the manufacturer’s brochure.

AC specifications

Rated apparent power125 kVA
Maximum apparent power137.5 kVA
Maximum output current200 A
AC output voltage230 / 400 V
Rated frequency50 / 60 Hz
Power factor−0.99…0.99
Wiring configuration3W + N + PE
Operating modesOn-grid and off-grid

Battery system

Cell chemistryLiFePO4 (LFP)
Rated cell capacity314 Ah
Rated energy capacity261 kWh
Battery configuration1P52S × 5S
Battery operating voltage728–949 V DC
Charge / discharge power rate0.5P
Cycle life8000 cycles (25 °C, 0.5P, 90% DoD, 70% EOL)

Construction and operation

VariantEU
Ingress protection≥IP54
Dimensions1006 × 1406 × 2502 mm, excluding lifting hooks
Net weight2700 kg
Operating temperature−20…+55 °C
Relative humidity0–95%, non-condensing
Noise level≤75 dB
Fire suppressionPack and cabinet aerosol protection; cabinet water protection
Manufacturer-listed standardsCE / UN 38.3

Vezemo verified

Sourcing and delivery under one contract

C3 (EU) is a regional manufacturer variant. CN and EU share a specification table; documentation and local grid compliance must be confirmed before supply. The C3 table does not specify a dedicated PV/DC/DC input. Both variants share the C3 series illustration.

Start with a consultation

Write to us

Describe your task. We will respond within 24 hours with practical next steps.

By submitting this form, you consent to the processing of the provided contact details so we can respond to your request.